{"id":418,"date":"2026-06-10T11:52:58","date_gmt":"2026-06-10T11:52:58","guid":{"rendered":"https:\/\/smartsky-engineering-13ee207.ingress-daribow.ewp.live\/?post_type=projects&#038;p=418"},"modified":"2026-06-10T12:00:49","modified_gmt":"2026-06-10T12:00:49","slug":"the-massive-mila-landslide-of-2020","status":"publish","type":"projects","link":"https:\/\/smartsky-engineering.com\/fr\/projects\/the-massive-mila-landslide-of-2020\/","title":{"rendered":"The massive Mila landslide of 2020"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Following the August 2020 earthquake, a major landslide was triggered in Mila, located in northern Algeria. Our firm undertook comprehensive monitoring of the site, covering a total area of 280 hectares using drones, while also conducting in-depth geotechnical investigations across the entire affected zone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The main actions carried out included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Digitization of a 280-hectare area using drones.<\/li>\n\n\n\n<li>Detailed analysis of the collected geotechnical data.<\/li>\n\n\n\n<li>Comprehensive slope stability assessment and continuous monitoring via drones, enabling precise zoning of high-risk areas.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These measures provided a clearer understanding of the destabilization mechanisms and delivered critical data to support risk management decisions and urban planning in the affected region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"featured_media":419,"template":"","meta":{"_acf_changed":true},"project-tags":[9,10],"class_list":["post-418","projects","type-projects","status-publish","has-post-thumbnail","hentry","project-tags-constantine-agency","project-tags-geotechnics"],"acf":[],"_links":{"self":[{"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/projects\/418","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/media\/419"}],"wp:attachment":[{"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/media?parent=418"}],"wp:term":[{"taxonomy":"project-tags","embeddable":true,"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/project-tags?post=418"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}