{"id":234,"date":"2026-06-07T11:01:51","date_gmt":"2026-06-07T11:01:51","guid":{"rendered":"https:\/\/sse.local\/?post_type=projects&#038;p=234"},"modified":"2026-06-10T12:31:45","modified_gmt":"2026-06-10T12:31:45","slug":"etude-et-assistance-technique-dun-ouvrage-hydraulique-strategique-oued-seybouse","status":"publish","type":"projects","link":"https:\/\/smartsky-engineering.com\/fr\/projects\/etude-et-assistance-technique-dun-ouvrage-hydraulique-strategique-oued-seybouse\/","title":{"rendered":"Study and technical assistance for a strategic hydraulic structure \u2013 Oued Seybouse"},"content":{"rendered":"<p class=\"wp-block-paragraph\">As part of the downstream connection project between the El Tarf desalination plant and the Chaiba reservoir (Annaba), SMARTSKY Engineering carried out the study and provided technical assistance throughout the construction of a civil engineering structure crossing Oued Seybouse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\ud83d\udccd Executed in a demanding hydraulic environment, this project required a rigorous approach to address site constraints and ensure controlled execution of the works, all completed within a record timeframe of one month.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\ud83d\udd0d The SSE approach was based on:<br>\u25aa\ufe0f A comparative techno-economic study of several solutions (micro-tunneling, piled structure, etc.)<br>\u25aa\ufe0f Preparation of the execution design file<br>\u25aa\ufe0f Continuous technical assistance to the contractor throughout all phases of the works<br>\u25aa\ufe0f Close site supervision to ensure compliance with plans and project requirements<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2705 Results:<br>\u25aa\ufe0f An optimized solution adapted to site constraints<br>\u25aa\ufe0f Effective control of execution conditions in a sensitive hydraulic environment<br>\u25aa\ufe0f Delivery in full compliance with technical requirements and quality standards<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through this project, SSE reaffirms its commitment to delivering reliable, sustainable infrastructure tailored to real-world conditions.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/3i5w5tcdteg.preview.infomaniak.website\/wp-content\/uploads\/2026\/06\/2-1-1024x1024.png\" alt=\"\" class=\"wp-image-236\" style=\"width:529px;height:auto\" srcset=\"https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/2-1-1024x1024.png 1024w, https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/2-1-300x300.png 300w, https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/2-1-150x150.png 150w, https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/2-1-768x768.png 768w, https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/2-1.png 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/3i5w5tcdteg.preview.infomaniak.website\/wp-content\/uploads\/2026\/06\/3-1-1024x1024.png\" alt=\"\" class=\"wp-image-237\" style=\"width:524px;height:auto\" srcset=\"https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/3-1-1024x1024.png 1024w, https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/3-1-300x300.png 300w, https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/3-1-150x150.png 150w, https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/3-1-768x768.png 768w, https:\/\/smartsky-engineering.com\/wp-content\/uploads\/2026\/06\/3-1.png 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>","protected":false},"featured_media":235,"template":"","meta":{"_acf_changed":true},"project-tags":[9,10,6],"class_list":["post-234","projects","type-projects","status-publish","has-post-thumbnail","hentry","project-tags-constantine-agency","project-tags-geotechnics","project-tags-hydraulics"],"acf":[],"_links":{"self":[{"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/projects\/234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/media\/235"}],"wp:attachment":[{"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/media?parent=234"}],"wp:term":[{"taxonomy":"project-tags","embeddable":true,"href":"https:\/\/smartsky-engineering.com\/fr\/wp-json\/wp\/v2\/project-tags?post=234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}